Customization: | Available |
---|---|
Blade Type: | Turbine |
Manufacturing Process: | Sintered |
Still deciding? Get samples of US$ 5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
4. Production process.
Raw material→ powder mixing→steel core→cold press→sintering→surface treatment→packaging→dispatch
5. Delivery time
Sample delivery: If we have stock, the delivery time is within one week after we got your sample payment.
If we don't have stock, the delivery time will depend on the sample production.
For batch order, delivery time is usually 3-4 weeks after order confirmation and payment.
Specification for reference: (others also availiable as per required)
Item No. | Diameter | Segment Height | Segment Width | Arbor |
STBA10508 | 105mm | 8mm | 2.2mm | 22.23mm |
STBA11508 | 115mm | 8mm | 2.2mm | 22.23mm |
STBA12508 | 125mm | 8mm | 2.2mm | 22.23mm |
STBA15008 | 150mm | 8mm | 2.2mm | 22.23mm |
STBA18008 | 180mm | 8mm | 2.5mm | 22.23mm |
STBA23008 | 230mm | 8mm | 2.7mm | 22.23mm |
STBA30010 | 300mm | 10mm | 3.2mm | 25.4mm |
STBA35010 | 350mm | 10mm | 3.2mm | 25.4mm |